Overview
Teambox develops complete architecture projects, guiding the process from site analysis and client needs through to planning permission and construction drawings.
The work focuses on space organisation, the relationship with light, legal constraints and aligning the project with the client's budget and expectations. Every decision is intended to be clear, justified and technically achievable.
Throughout the different phases, we coordinate architecture with engineering disciplines and construction solutions, ensuring a consistent project that is ready to be built.
Project phases
- Concept study — survey, site analysis and spatial organisation proposals, with validation of technical and legal feasibility.
- Planning permission — preparation and submission to the local authority, including drawings, design statement and responses to requests for clarification.
- Construction drawings — technical development for construction, including materials, construction details and coordination with engineering disciplines.
- Construction support — clarifications and coordination during construction to ensure alignment with the approved project, within the agreed scope.
Frequently asked questions
What is an architecture project?
It is the set of studies, drawings and technical documents that define the organisation, construction and legal framework of a building. It forms the basis for planning permission and for carrying out the works.
What is included in an architecture project?
It depends on the phase commissioned. It may include a concept study, a planning application project, coordination of engineering disciplines and construction drawings.
Is planning permission always required?
Not always. New builds and renovations with structural or urban planning impact require permission. Simple interior interventions may not, depending on the municipality and the nature of the works.
How long does an architecture project take?
It varies with the type of intervention, area and complexity. On average, the concept study and planning process can take between 4 and 12 weeks, and may be extended depending on requests for clarification from the authorities.
Can I commission only the concept study?
Yes. The concept study can be developed independently, allowing solutions to be assessed before proceeding to planning or construction.
Do you help with the choice of materials and finishes?
Yes. The selection of materials and finishes is normally developed during the construction drawings phase, adjusted to the budget and the characteristics of the works.
Does Teambox supervise construction?
Yes, as a complementary service. Construction supervision includes site visits, technical clarifications and verification of compliance with the approved project.